Invoice 1954

    $9,087.19

    SKU: 1954 Category:

    Description

    Invoice 1954
    Custom LED Surround for YMCA

    1 -Custom SR Triangle Mask – 5/8″ Plywood facade frame Assembly – Custom design to fit client drawings. Approximately 3′ Wide with approximately 23′ Length and 3.5″ depth. Frame to be painted front and back – Pro Mar 200 – Eggshell – Black
    1 – Custom SR Triangle Mask- 1/8″ PVC – Black – Overlay
    1 – Custom SL Triangle Mask – 5/8″ Plywood facade frame Assembly – Custom design to fit client drawings. Approximately 3′ Wide with approximately 23′ Length and 3.5″ depth. Frame to be painted front and back – Pro Mar 200 – Eggshell – Black
    1 – Custom SL Triangle Mask- 1/8″ PVC – Black – Overlay
    1 – Custom SL Edge Mask – Over-lay plates to mount directly on top of LED wall (no additional structure)
    1 – Custom SL Edge Mask- 1/8″ PVC – Black – Overlay
    1 – Custom SR Edge Mask – Over-lay plates to mount directly on top of LED wall (no additional structure)
    1 – Custom SR Edge Mask- 1/8″ PVC – Black – Overlay
    Subtotal: $9,079.50

    4 – Rigging Hardware to attach facade -Ver locks, Clamps, Bolts, Pipe, Tape, Etc. Assumes ability to use client provided rigging that is supporting LED wall. Additional cost make be incurred if additional support is needed*
    Subtotal: $1,994.88

    1 – Lead scenic tech – Travel rate – 9/12/26
    1 – Lead scenic tech – Setup Day rate – 9/13/26
    1 – Lead scenic tech -Travel day rate – 9/14/26
    Subtotal: $3,225.00

    1 – Travel for technician – Roundtrip flight
    2 – Hotel to be provided by client *Mod Scenes can provide at additional cost
    Subtotal – $750.00

    1 – Dedicated trucking to event venue
    Subtotal: $3,125.00

    Total Due: $18,174.38
    Deposit: $9,087.19

    You may also like…